JRF Heating Ltd JRF Heating's Home page Services offred by JRF Heating Ltd Products available through JRF Heating Ltd Contact JRF Heating Ltd
Albion Vented Hotwater Cylinder Combi
Albion Vented Hotwater Cylinder Combi dimensions
Albion Vented Hotwater Cylinder Combi chart
Albion Vented Hotwater Cylinder UltraCyl
Albion Vented Hotwater Cylinder UltraCyl sizes
Albion Vented Hotwater Cylinder UltraCyl 90 diag
Albion Vented Hotwater Cylinder UltraCyl 130 diag
Gledhill Hotwater Cylinders
Gledhill Hotwater Cylinders
Gledhill Hotwater Cylinders

Hotwater Storage Cylinders - Conventional (Vented)

Albion COMBINATION UNITS - BS3198: 1981

Albion combination units offer traditional open vented stored hot water in either direct, indirect or single feed patterns. The full British Standard range is available, other sizes can be made to requirement.

By storing the cold supply, tanks can be taken from the loft space. Installation is made simpler without the need to run pipes to and from the cold cistern.

With an integrated cold supply, these units offer a practical and efficient solution where space and easy installation are important factors.

  • Shell all copper to BS 2870 with zinc free brazing alloy. Tubes to BS EN 1057.
  • Aluminium close fitted lid.
  • Three male or female up to 1". Immersion Heater Boss 2 1/4". Drain Boss 1/2" female. All sizes comply with BS 1566:2002 and are kitemarked Special sizes to order.

Albion UltraCyl 90 / 130

Exceeds British Standard pumped primary requirement. Meets new basic practice CHeSS standards. Albion Ultracyl can only be used with fully pumped primary systems.

Using the heat from your engine this efficient water heater can provide enough water for handwash on site. Applications include use for motorhomes, for workmen on site, e.g. Telecoms Industry, for agriculture workers and for the building and construction industries.

Seven litres of water can be stored and heated. The unit connects to the cooling system of any motor vehicle engine and has a thernostat control to prevent boiling.

  • Shell all copper to BS 2870 with zinc free brazing alloy. Tubes to BS EN 1057.
  • Aluminium close fitted lid.
  • Three male or female up to 1". Immersion Heater Boss 2 1/4". Drain Boss 1/2" female. All sizes comply with BS 1566:2002 and are kitemarked Special sizes to order.
Albion Vented Hotwater Cylinder UltraCyl 90 specs
Albion Vented Hotwater Cylinder UltraCyl 90 specs

Gledhill Hotwater Cylinders

Gledhill Building Products are manufactured under an ISO 9001:2000 quality management system which is independently audited and accepted BSI. All our products meet or exceed industry standards and comply with Water Regulations and Building Regulations.

All cylinders are available with either a top or side entry immersion heater boss on request and can be manufactured to suit: 10m, 15m or 30m working heads. Compression fittings are supplied and fitted free if required.

SAP Assessment - Use the appropriate loss factor in the ‘foam’ column in Table 2 of the SAP. The insulation thickness will normally be 30mm unless the client has specified otherwise. The factor for 30mm is 0.013GJ/Year/Litre.

Corrosion protection - All fully pumped indirect cylinders or combination tanks can be supplied with Corrosion Resistant Technology (CRT). This prolongs the life of the cylinder in aggressive water areas. (The mains water must be supplied by the mains water board - water from bore holes etc are not covered.)

Sizes - Generally domestic cylinder production encompasses capacities up to 360 litres in diameters from 300mm to 500mm, heights up to 2000mm and with working heads up to 30 metres. These are not limitations however, and many units outside these parameters are supplied every month at the suggestion of the specifier or our own design team.